Quick answer. A quality claim is settled by evidence rather than by argument, and the first document in that evidence is the specification rather than the photograph. What makes a claim succeed is a comparison — the written specification, the sealed sample and the records from the run, held before the shipment arrives rather than assembled afterwards.
1. The four pieces of evidence
- The written specification. Fibre, blend ratio, weight, measurements with tolerances and construction detail. Without it there is no standard to depart from.
- The sealed approved sample. Held by both sides, since it is what the delivery is measured against.
- The inspection records. Produced during the run, which describe the process rather than only the goods.
- Evidence from arrival. Photographs with the batch reference visible, counts, and where relevant a third-party re-inspection.
2. Why claims fail
- No comparison basis. The most common reason, and it is a specification problem rather than a quality one.
- Verbal specification. Which turns the claim into a discussion about recollection.
- Evidence gathered too late. Goods repacked, distributed or disposed of before they were documented.
- Photographs without the batch reference. Which cannot be tied to the shipment being claimed about.
- Claiming a delivery against a sample nobody sealed. Which leaves the two sides comparing different garments.
- A total figure without a defect type. Which cannot be traced to a stage, so the remedy cannot be aimed.
3. What to do at arrival
- Inspect against the reference. Measurements at the points of measure, against the approved tolerances.
- Photograph with the reference visible. The batch number, the carton mark and the carton in context, not only the defect.
- Count and classify. How many units, of which defect type, and at which severity.
- Keep the packaging. The pack and the carton marks are part of the evidence.
- Do it in the first days. Not because of a rule, but because that is when the goods are still exactly as they arrived.
4. How a claim is raised
- Notify in writing within the stated period. Which is why the period belongs in the agreement rather than in a convention.
- Attach the evidence. Specification, reference sample, records and the arrival documentation, as one set.
- Name the defect type. Rather than describing a general dissatisfaction, since the type is what the remedy attaches to.
- State what is asked for. Replacement, credit or rework, with the schedule effect of each.
- Ask for the corrective action. Since a claim that ends in a credit note leaves the stage unchanged.
5. The five exception types and what each one needs
Arrival exceptions are not one problem. They differ in what can be proved and in what remedy is worth asking for, and treating them as a single category is the reason many claims stall before they reach a remedy. Five types cover almost everything that comes off a container.
| Exception type | What it looks like at opening | What decides it | Remedy that usually fits |
|---|---|---|---|
| Short shipment | Cartons or units missing against the packing list | The carton count at seal, the packing list and the loading tally | Replacement shipment, or credit for the missing quantity |
| Wrong size or size mix | The ratio does not match the order; one size dominates the cartons | Per-size count against the confirmed size ratio | Replacement of the missing sizes, not a credit for the whole lot |
| Mixed colour or shade | Two shade bands in one carton, or a lot visibly off the approved dip | The approved lab dip read against the goods in daylight | Sorting and re-packing, or replacement of the off-shade units |
| Workmanship beyond the stated level | Open seams, skipped stitches, needle marks, trim faults | A sample drawn to the agreed plan and graded against the defect classes — AQL 2.5 to ISO 2859-1 is our standard | Rework at the source, or credit on the affected portion |
| Wrong style or trim | The garment is right but the waistband, label or print is not what was approved | The approved sample and the trim card | Replacement — this type is not repaired by rework |
The counting discipline is the part buyers skip. A claim stated as “about 8% defective” cannot be aimed at a stage. A claim stated as “eleven cartons of style 4127 in size L show an open crotch seam, drawn from cartons 14 to 24” can. The same logic applies to a size mix: the useful number is the per-size variance against the confirmed ratio, not the total piece count, because a lot can be complete in total and still be unusable at retail if the size curve is wrong. A short shipment is decided the same way — carton count at the seal, then the packing list, then the loading tally, in that order, since the first disagreement identifies the stage where the units left.
Shade is the exception most often argued and least often documented. It is decided against the approved lab dip under daylight or a D65 viewing condition, not under the warehouse strip light, and a difference that appears under only one of those is worth describing precisely before it is called a defect. Mixed colour is also the one exception where a partial remedy usually works: separating the off-shade units and re-packing the rest keeps the season intact, while a return of the whole lot rarely does.
Where the exception involves a label — a fibre percentage, a country of origin, a care instruction — the standard behind it is external rather than contractual. Fibre content and origin sit under 16 CFR Part 303 in the United States and Regulation (EU) No 1007/2011 in the European Union, with care instructions under 16 CFR Part 423. A label error is not a matter of degree the way a seam is, which changes the remedy: it is corrected by relabelling or by replacement, not by a discount. Construction disputes have an equally specific reference point — a four-needle six-thread flatlock is ISO 4915 type 607 — and whether the seam on the garment is that stitch or a mock is checkable rather than arguable, as set out in the flatlock seam inspection guide.
Choosing between rework, credit and replacement is arithmetic before it is negotiation. Rework keeps the goods and spends time in the schedule. A credit closes the file and leaves the fault in the line. Replacement spends freight twice and asks for a second production slot. The split that usually holds: rework where the fault is repairable and the season still allows it; replacement where the fault is not repairable, or where the quantity is simply not there; credit only where the goods are usable at a lower grade and the buyer can sell them that way. What should not happen is a credit note issued without a corrective action, because the cost is then paid once and the cause stays in place.
Two checks make the conversation shorter before it starts. The first is the supplier verification work in the twelve-point supplier verification checklist, which establishes whether the partner factory’s own inspection would catch these five types at all. The second is the first-order failure list, which covers the specification gaps that produce most of them.
6. The comparison that decides it
- Delivered against specified. Measurements and construction, item by item.
- Delivered against sealed. The reference both sides hold.
- Delivered against the records. Whether the run’s own checks would have caught it, and whether they did.
- A verifiable claim needs all three. Which is why the evidence is assembled before the conversation rather than during it.
7. Common errors
- Leading with the photograph. Which shows a problem without establishing the standard it departed from.
- Waiting for a pattern to emerge. The evidence is strongest in the first days after arrival.
- Claiming on a description. Which is where a verbal specification becomes expensive.
- Accepting a credit without a process change. Which resolves the cost and repeats the cause.
- Not stating the defect type. Which leaves the remedy unattached to anything specific.
- Filing the evidence separately from the order. Which is how the reference cannot be found when it is needed.
8. How to compare two suppliers on this
- Both with a written specification. Since it is the first document a claim depends on.
- Both with a sealed sample held. By the supplier as well as the buyer.
- Both with records produced during the run. Rather than a report written for the shipment.
- Both with a stated claim period. Since the notice period is what makes a claim timely.
- Both with a stated corrective-action expectation. Which is what distinguishes a supplier who fixes from one who credits.
· Xiamen Unitex Trade Co., Ltd. — OEM & ODM underwear sourcing partner
