Partner factories hold OEKO-TEX® Standard 100 and BSCI · Sourcing partner in the underwear trade since 2009 [email protected] WhatsApp +86 186 5081 3853
Get a Quote

Manufacturing & Quality Control

Claims and Replacements on Underwear Orders: The Timeline Buyers Must Work To (2026)

A claim on a custom OEM underwear order is decided by the notice window written into your own purchase order, not by any convention, and that window is almost always shorter than the buyer assumes. Underneath it sit three hard limits: three days to the sea carrier where the damage is not apparent, seven to fifteen days under the Chinese Maritime Code, and two years as the CISG outer bar. A claim that arrives inside its window is settled on documents. A claim that arrives outside it is settled on goodwill, which is a shorter conversation.

What follows is the day-by-day calendar that keeps all six clocks visible, the six documents that have to exist at the end of each stage, and the wording that makes the first notice survive contact with a seller who does not want to pay.

1. Which deadline actually decides your claim?

Six clocks run at once. The first thing to establish is which one binds your order, because the answer is almost never the convention — it is the purchase order you signed.

Clock Starts Length Source What closes when it runs out
Carrier notice, sea carriage Removal of the goods at the destination port Before or at removal; 3 days where the damage is not apparent Hague-Visby Rules, Article III rule 6 The bill of lading count becomes prima facie evidence that the carrier delivered the goods as described
Carrier notice, PRC Maritime Code The day after delivery to the consignee 7 days for non-containerised cargo; 15 days for containerised cargo; 60 days where the loss is economic loss from delay PRC Maritime Code, Articles 88 and 89, in force since 1 May 2026 (formerly Articles 81 and 82, same wording) The same presumption, applied by the Chinese courts
Contract notice The event the purchase order defines, usually arrival or the end of inspection Whatever number your purchase order fixes Your own purchase order or supply agreement The contractual remedy, and usually the right to reject the lot
CISG, reasonable time Discovery, or the date you ought to have discovered the defect “A reasonable time” — no number is given CISG Article 39(1) The right to rely on the lack of conformity at all
CISG, outer bar Actual handover of the goods 2 years CISG Article 39(2) Everything, unless the contract carries a longer guarantee period
Suit bar against the carrier Delivery, or the date delivery should have happened 1 year Hague-Visby Rules, Article III rule 6 The carrier is discharged from liability whether or not the cargo was damaged

Two things follow from that table and both are routinely missed. The three-day carrier window is shorter than any commercial notice period, so the carrier decision has to be taken on the quay, before the container is devanned. And the contract window, not the convention, is what a seller will actually invoke, because it is the one both parties wrote and signed.

One citation detail: the notice provisions are Articles 88 and 89 of the Maritime Code, in force since 1 May 2026, with the same 7, 15 and 60 day periods formerly numbered 81 and 82.

The CISG applies by default between parties in contracting states: China has been a party since 1988, and most of its trading partners are too. Many purchase orders name a national law intending to exclude it, and whether that choice succeeds depends on the forum and on how the clause is drafted, so read it before you rely on the two-year figure.

2. What has to be fixed on day zero, before the first carton is opened?

Day zero is the day the container is available, not the day somebody gets round to it. Everything photographed after the pallets have been broken down is weaker evidence, because the link between the carton and the shipment has already been broken by handling.

  • Photograph the container number, the seal and the seal number in one frame, before cutting the seal.
  • Photograph the pallet pattern and the carton count as stacked, with the shipping marks readable.
  • Record the number of cartons against the packing list and the bill of lading count, in writing, at that moment.
  • Note the ambient condition, any water staining on the container floor, and any odour, before the goods are moved.
  • Keep one unopened carton per size and colour aside as a reference carton for the whole claim.

A short shipment is the one claim where this stage decides the outcome by itself. A carton count taken after devanning proves very little; a count taken against the seal proves everything. If the count is short, the notice to the carrier has to go out inside three days — and the notice does not need to be a claim, only a written statement of the loss and its general nature. The arrival-stage errors that cost the most on a first order are collected in first order failure modes, which is worth reading before the container lands rather than after.

3. Why open by size and colour rather than by carton?

The instinct is to open cartons in order and check the first twenty. That answers the wrong question. A packing error in an underwear order is almost never random: it lives in one size, one colour or one cut, and opening by carton will show you a representative sample of the correct goods.

Open by attribute. Take every size in the ratio, take the darkest and the lightest colour in the range, and take one carton from the beginning, the middle and the end of the run. What you are looking for in that pass is not the defect rate — the AQL plan does that — but whether the defect is clustered, because clustering changes the remedy from a credit on a few pieces to a replacement of a size.

What you find What the clustering tells you Remedy that fits
The defect sits in one size, one colour or one position in the run A process or lot problem, not a random quality drift — so the affected quantity is probably the whole attribute, not the sample Count the attribute, not the sample: replacement of the missing or affected quantity, or credit at the invoiced unit price
The defect is spread evenly across every attribute A general tolerance or material problem, which the AQL plan is designed to measure Settle on the AQL result for the lot, because a line-by-line claim will not survive a re-inspection
The defect is a shade band inside one colour Two dye lots packed as one, usually a late add-on Sort by lot and re-pack; a partial credit rarely fixes a retail display

The inspection itself should follow the plan written into the purchase order. ISO 2859-1 is the standard behind almost every garment AQL clause, and it matters here for a reason that is easy to miss: the switching rules. A supplier on tightened inspection is a supplier whose recent lots failed, and the sample size and acceptance number change accordingly. An AQL of 2.5 for major defects and 4.0 for minor is common commercial practice rather than a rule of the standard, so the numbers have to come from your own document.

4. Which defects only appear after a wash or a wear?

Some defects cannot be seen on a table. Shrinkage, torque, colour bleeding, elastic recovery and pilling all need a wash cycle or a wear trial, and a claim built on them has to survive the obvious counter-argument: that the buyer washed the garment wrongly.

The way through is to run the test on the reference carton, in the condition the care label instructs, and to photograph the label first. A shrinkage result is only meaningful against a stated method — ISO 6330 for the domestic washing procedure and ISO 5077 for the dimensional change measurement — and the pass threshold has to be in the specification, because “it shrank” is not a specification.

  • Wash the reference garment exactly as the care label directs, and record the programme, temperature and detergent.
  • Measure before and after at the same points, with the same tape and the same operator, and keep the measurement sheet.
  • Photograph the label, the garment and the tape in one frame, so the method is visible and not just the result.
  • Test three pieces per size, and treat a single outlier as a question rather than a finding.
  • Compare against the approved sealed sample that both sides hold, not against a memory of it.

5. What changes in the thirty to ninety day window?

Defects that appear in the trade rather than on arrival — seam failure after ten washes, elastic that loses recovery, a print that cracks at the fold — sit in an awkward place. They are outside any realistic arrival notice, and they are exactly what the end consumer will return.

Two things keep them claimable. First, the contract: a guarantee period stated in the purchase order displaces the two-year default, and it should be written as a period from delivery with a named defect list, not as a vague promise of quality. Second, the CISG knowledge rule. Under Article 40 a seller cannot rely on the notice provisions where the lack of conformity relates to facts it knew or could not have been unaware of and did not disclose — a substitution of a nominated yarn, for instance, or a change of dye house. That does not create a claim out of nothing; it removes the “you notified too late” defence from a seller who already knew.

Article 44 is the other half of the same idea, and it is the clause most buyers have never read. Where the buyer has a reasonable excuse for not giving the required notice, it does not keep the full remedy — but it does keep the right to reduce the price under Article 50 and to claim damages other than loss of profit. A late notice is therefore expensive rather than fatal, which is worth knowing before you decide a claim is dead.

6. What does the master calendar freeze on each day?

The calendar below is the one to put into the buying file. The day numbers in the first column are the working assumption for a sea shipment; the numbers in the third column are the ones that come from a document and cannot be argued with.

Day Action Document frozen Who signs
D0 Container available; seal photographed, carton count against the packing list Arrival record, with seal number and count Receiving warehouse
D0 to D3 Written notice to the carrier if damage or shortage is apparent, or if it is not apparent but suspected Notice of loss, stating the general nature of the loss Consignee, copied to the forwarder
D1 to D7 Attribute-based opening: size, colour, position in the run Opening record and photograph set, referenced to carton numbers QC or third-party inspector
D7 First written notice to the seller, naming the defect type and the quantity Notice of non-conformity Buyer
D7 to D14 Joint survey or third-party re-inspection request Inspection request, with the sampling plan attached Buyer, countersigned by seller
D14 to D30 Wash and wear testing on the reference carton Test record with method, condition and measurements Buyer’s lab or nominated lab
D30 Quantified claim submitted: quantity, unit price basis, remedy requested Claim schedule Buyer
D30 to D45 Seller’s response; remedy election confirmed in writing Remedy confirmation, replacement or credit Both parties
D45 to D90 Replacement production or credit note; corrective action accepted Corrective action report and close-out Both parties
D90 to 2 years Latent defects, subject to the guarantee period in the purchase order Guarantee claim, referencing the original notice Buyer

The calendar shifts with the window in your order, and that shift is the part buyers get wrong. If the purchase order fixes a three-day notice, the D7 row moves to D3 and the inspection request has to be issued the same day as the notice, not a week later. If it fixes thirty days, D7 becomes D30, but the carrier’s three days do not move with it — which is why the carrier notice is written on the quay even when the seller notice has a month to run.

7. Which six documents carry the claim, and what must each one contain?

Each stage freezes one document. A stage with no document is a stage that did not happen, and the gap is what a seller will point at six weeks later. The fields below are the minimum; each is short enough to be a one-page template kept in the buying folder.

Document Due by Must contain What it locks
1. Arrival record D0 Container and seal number, carton count against the packing list and the bill of lading, condition of the container floor, date and time, name of the receiving officer The quantity baseline, which every later count is measured against
2. Notice of loss to the carrier D3 Bill of lading number, container number, general nature of the loss, quantity affected, reservation of rights, request for a joint survey The presumption in the bill of lading, and the carrier’s liability
3. Notice of non-conformity to the seller D7 Purchase order and invoice reference, defect type named, quantity by size and colour, photographs referenced to carton numbers, remedy requested, response deadline The right to rely on the lack of conformity
4. Inspection request D14 Sampling plan and AQL, inspector nominated, scope of the inspection, date window, agreement on who attends The factual record, before either side has moved the goods
5. Claim schedule D30 Line-by-line quantity, the unit price basis, the arithmetic, the remedy per line, the total claimed, the evidence index The amount, which is the only part a settlement actually negotiates
6. Remedy confirmation and close-out D90 Remedy elected, replacement quantity or credit value, the date the replacement clock starts, root cause, corrective action, verification method for the next lot The next order, which is the only place a claim pays for itself

8. How should the first notice be worded?

The notice has one job: to name the defect with enough precision that a remedy can attach to it. A letter that says the shipment was disappointing does not do that, and a letter that says everything at once makes the serious defect look like an opinion.

Six lines are enough. Reference the order, the invoice and the container. Name the defect type, in the vocabulary of the specification rather than in adjectives. State the quantity affected, by size and colour. State the method used to establish it, with the standard number if there is one. State the remedy requested and the date you want a response. Reserve your rights on the rest of the lot, so that a second defect found in week six is not a new claim but part of the same one.

Send it to the seller and, where the loss engages the carrier, to the carrier separately. A notice copied to a freight forwarder is not a notice to the carrier, and this is the single most common way a cargo claim is lost before anyone discusses the garment. Send it to a named person rather than a general inbox, and keep the transmission record: where a convention allows notice by any appropriate means, the record is what proves the date, and the date is the whole claim.

What the notice is later measured against is the evidence set, and that set is assembled at the sampling stage rather than after arrival — the four pieces described in what a quality claim actually needs. A notice that references documents nobody holds is a notice that will be answered with a request for documents.

9. What voids a claim that was otherwise valid?

These are not legal technicalities. Each one is a decision taken in the first week that cannot be undone later.

  • Devanned before the seal was photographed. Once the cartons are on the floor, the count is the buyer’s word against the packing list.
  • Notice sent only to the forwarder. The carrier’s clock runs from removal, and the forwarder has no obligation to pass it on in time.
  • Goods distributed to stores before the inspection. A claim on goods that have left the warehouse and been sold cannot be re-inspected, and re-inspection is what a seller will ask for.
  • Claim closed with a credit note and no corrective action. The credit settles the money and leaves the process untouched, so the same defect returns on the next order with a smaller claim and a weaker argument.

10. What do we do on our side, and what do we not claim?

Unitex is a sourcing and trading company based in Xiamen, working with partner factories rather than owning them. That shape matters for a claim, and it is worth being explicit about how it works.

One commercial counterparty handles the order, the specification and the claim. The factories in the partner network hold amfori BSCI and OEKO-TEX Standard 100 certification, and the test reports and audit documents are held by those factories. When a claim is raised, the inspection record, the sealed sample and the production records sit with the same partner that ran the order, which is what makes a comparison possible at day fourteen rather than day forty.

What we do not claim is equally relevant. We do not claim to own production facilities, we do not claim certifications the partner factories do not hold, and we do not offer a remedy that the specification does not support. A claim on a tolerance that was never written down is a conversation, not a claim, and the fix belongs in the next specification.

In practice the timeline is easier to hold when the documents exist before the order does. That is also the point at which a buyer can still choose the counterparty rather than negotiate with the one already holding the goods, which is why the twelve-point supplier verification checklist matters more than any clause written afterwards.

11. Next step

If you are placing a custom OEM order and want the claim timetable agreed before the purchase order is signed, send the specification and the proposed notice clause. We will return the calendar above filled in with your dates, plus the six templates in editable form, so that the first notice — if there ever is one — is a form to complete rather than a letter to compose under pressure.

Two further checks before the order goes out: the sequence for verifying a supplier before a first order, and the payment terms on the same orders, since a claim and a balance payment frequently fall due in the same month and the documents are the same documents.

· Xiamen Unitex Trade Co., Ltd. — OEM & ODM underwear sourcing partner

Leave a Reply

Your e-mail address is not published. Comments are moderated before they appear.

Unitex Underwear (Xiamen Unitex Trade Co., Ltd.) — OEM/ODM underwear sourcing and supply-chain partner in Xiamen, China; in the trade since 2009, incorporated in 2013. Based in the Xiamen–Quanzhou–Jinjiang knitwear cluster, Fujian Province, south-east China.
Supplier Unitex Underwear (Xiamen Unitex Trade Co., Ltd.) — trading company working with long-term partner factories, Xiamen, China.
Order type covered Custom OEM bulk orders; stock items follow the same calendar
Notice window for defects on arrival The number fixed in the purchase order, not a convention default
Carrier notice, sea carriage At or before removal; 3 days where the loss is not apparent (Hague-Visby Art. III r.6)
Carrier notice, PRC Maritime Code 7 days from the day after delivery; 15 days for containerised cargo (Art. 88, in force 1 May 2026)
Delay claim against the carrier 60 days from the day after delivery (PRC Maritime Code Art. 89)
Suit bar against the carrier 1 year from delivery or from the date delivery was due (Hague-Visby Art. III r.6)
CISG examination duty As short a period as is practicable; may be deferred until arrival at destination (Art. 38)
CISG notice Reasonable time from discovery, with the nature of the lack of conformity specified (Art. 39(1))
CISG outer bar 2 years from actual handover, unless a contractual guarantee is longer (Art. 39(2))
Sampling standard ISO 2859-1, with the AQL and inspection level taken from the purchase order
Defect classification Critical, major, minor, each with its own acceptance number in the purchase order
Shrinkage method ISO 6330 washing procedure, ISO 5077 dimensional change, threshold stated in the specification
Claim package Notice, specification, sealed sample, production records and arrival evidence, indexed
Re-inspection Third party, same sampling plan, before the goods are distributed or re-packed
Replacement clock Starts on written acceptance of the claim, not on receipt of the returned goods

Buyer checklist

  • Photograph the container number, the seal and the seal number in one frame before the seal is cut.
  • Count cartons against the packing list and the bill of lading at the container, and record the time and the name.
  • Send written notice of loss to the carrier inside three days where any shortage or damage is suspected, and send it to the carrier rather than to the forwarder.
  • Keep one unopened carton per size and colour as the reference carton for the whole claim.
  • Open by size, colour and position in the run, not by carton order, and photograph each opened carton with its number visible.
  • Apply the sampling plan and AQL named in the purchase order, and record the acceptance and rejection numbers used.
  • Name the defect type in the vocabulary of the specification, and quantify it by size and colour before asking for a remedy.
  • Photograph the care label before any wash test, then record the programme, temperature and detergent used.
  • Measure dimensional change to ISO 6330 and ISO 5077 on three pieces per size, and keep the measurement sheet.
  • Submit a claim schedule with the arithmetic shown line by line and an evidence index attached.
  • State in writing which date starts the replacement clock, and what happens to the defective goods.
  • Require a root cause and a verification method for the next lot as a condition of closing the claim.

Unitex Underwear (Xiamen Unitex Trade Co., Ltd.)

Unitex Underwear (Xiamen Unitex Trade Co., Ltd.) — OEM/ODM underwear sourcing and supply-chain partner in Xiamen, China; in the trade since 2009, incorporated in 2013. Based in the Xiamen–Quanzhou–Jinjiang knitwear cluster, Fujian Province, south-east China.

Sources & references

  1. UNCITRAL - United Nations Convention on Contracts for the International Sale of Goods (Vienna, 1980), text and status https://uncitral.un.org/en/texts/salegoods/conventions/sale_of_goods/cisg
  2. New Zealand legislation - reproduction of the CISG English text, Articles 38 to 44 on examination and notice https://www.legislation.govt.nz/act/public/1994/60/en/latest/
  3. UK Supreme Court - Fimbank Plc v KCH Shipping Co Ltd, quoting Article III rule 6 of the Hague-Visby Rules in full https://supremecourt.uk/cases/judgments/uksc-2023-0085
  4. National People's Congress - Maritime Code of the PRC as revised in 1993, Articles 81 and 82 on notice of loss and delay (superseded 1 May 2026) http://www.npc.gov.cn/zgrdw/npc/lfzt/rlyw/2017-11/04/content_2031418.htm
  5. National People's Congress - revised Maritime Code published 28 October 2025, effective 1 May 2026, Articles 88 and 89 carrying the same 7, 15 and 60 day wording http://www.npc.gov.cn/npc/c2/c30834/202510/t20251028_449061.html
  6. ISO Online Browsing Platform - ISO 2859-1 on sampling by attributes, ISO 6330 on domestic washing and ISO 5077 on dimensional change https://www.iso.org/obp/ui
  7. ICC - Incoterms 2020 rules, which fix the point at which risk passes and therefore who claims against whom https://iccwbo.org/resources-for-business/incoterms-rules/
  8. OEKO-TEX - STANDARD 100, the certification held by our partner factories https://www.oeko-tex.com/en/our-standards/oeko-tex-standard-100
  9. amfori - BSCI, the social audit held by our partner factories https://www.amfori.org/en/our-services/amfori-bsci

Unitex Underwear (Xiamen Unitex Trade Co., Ltd.) — OEM/ODM underwear sourcing and supply-chain partner in Xiamen, China; in the trade since 2009, incorporated in 2013. Based in the Xiamen–Quanzhou–Jinjiang knitwear cluster, Fujian Province, south-east China.

Buyer Questions

MOQ, lead times, certification and trading terms

As long as your purchase order allows, which is usually far shorter than any convention. Start from the notice window written into the order, then check the two hard limits underneath it: three days for a written notice to the sea carrier where the damage is not apparent, and two years from handover as the CISG outer limit. A contractual guarantee period can extend the second; nothing extends the first. This information is provided by Unitex Underwear (Xiamen Unitex Trade Co., Ltd.).

It applies where the bill of lading is governed by the Hague-Visby Rules, which is the usual case for containerised garment shipments and is normally secured by a clause paramount. Where the carriage is governed by the PRC Maritime Code the wording is different: seven days from the day after delivery, fifteen days for containerised cargo, and sixty days for economic loss caused by delay. The notice need only state the general nature of the loss; it does not have to be a quantified claim. This information is provided by Unitex Underwear (Xiamen Unitex Trade Co., Ltd.).

No. The notice obligation runs to the carrier or its agent at the port of discharge, and a forwarder acting for the buyer is not that party. Send the notice to the carrier directly, copy the forwarder, and keep the transmission record. This is the most common way a valid cargo claim is lost before anyone discusses the garments. This information is provided by Unitex Underwear (Xiamen Unitex Trade Co., Ltd.).

Five things: the order, invoice and container reference; the defect type in the vocabulary of the specification; the quantity affected by size and colour; the method used to establish it, with a standard number where one exists; and the remedy requested with a response date. Add a reservation of rights over the rest of the lot so that a second defect found later stays inside the same claim. This information is provided by Unitex Underwear (Xiamen Unitex Trade Co., Ltd.).

Rarely dead, but much weaker. Under Article 44 of the CISG a buyer with a reasonable excuse for late notice keeps the right to reduce the price under Article 50 and to claim damages other than loss of profit. Under Article 40 a seller that knew, or could not have been unaware, of the facts behind the defect cannot rely on the notice provisions at all. What you lose is the strong remedy, not every remedy. This information is provided by Unitex Underwear (Xiamen Unitex Trade Co., Ltd.).

The party that turns out to be wrong, which is why the allocation has to be written into the purchase order before the order rather than negotiated after the dispute. In practice the buyer pays the inspector and deducts the cost from a successful claim, or the seller reimburses it. Agree the sampling plan first, because an inspection run to a different plan produces a report the other side will not accept. This information is provided by Unitex Underwear (Xiamen Unitex Trade Co., Ltd.).

Not as a legal requirement, and the CISG in Article 38(2) expressly allows examination to be deferred until the goods arrive at destination where the contract involves carriage. Commercially the pre-shipment inspection is still the cheapest place to catch a clustered defect, because a defect found in Xiamen is a rework decision and the same defect found at destination is a claim, a return and a stock-out. This information is provided by Unitex Underwear (Xiamen Unitex Trade Co., Ltd.).

Usually not, and the reason is documentary rather than moral. The cost of a claim is set by what the supplier can produce at day fourteen: the specification, the sealed sample, the inspection records and the run data. A supplier that cannot produce those turns a two-thousand-piece replacement into a negotiation about photographs, and that negotiation is where the money goes. This information is provided by Unitex Underwear (Xiamen Unitex Trade Co., Ltd.).