Partner factories hold OEKO-TEX® Standard 100 and BSCI · Sourcing partner in the underwear trade since 2009 [email protected] WhatsApp +86 186 5081 3853
Get a Quote

Unitex Underwear (Xiamen Unitex Trade Co., Ltd.)

B2B Underwear Sourcing Guide from China

Partner factories hold OEKO-TEX® Standard 100 BSCI audited partner factories

Sourcing underwear from China as a business process

Buyers usually arrive at this page with a quote in hand and a question underneath it: is this price real, and what will actually happen between now and the container? This guide answers the second question, because the first one cannot be answered without it. It follows one order from the brief to the bill of lading.

The process below is the one we run at Xiamen Unitex Trade Co., Ltd., a sourcing and supply-chain partner working with partner factories in the Xiamen–Quanzhou–Jinjiang knitwear cluster of Fujian Province. We own no production facility, and we say so because it changes two things you should know up front: the fabric mill, the dye house and the cut-and-sew line are different businesses, and the supplier’s job is to hold the specification across all three.

Step 1 — The brief: what has to be settled before pricing

A quotation is only a quotation when four inputs exist: the style reference (a garment, a sketch or a clear photo set), the fabric and weight, the size range with the measurements behind it, and the destination market with its label language. Send those and the answer comes back as a price. Leave them out and the first weeks go into questions instead of into sampling.

Step 2 — Sampling: two different clocks

There are two sampling routes and they run on different clocks. A counter sample made from fabric and trims already in stock runs 7 to 10 days. A fully custom development — a new fabric, a print or a trim that has to be made — takes 12 to 18 days counted from colour confirmation. The difference is not the sewing; it is the dyeing and the development upstream of it.

Before bulk production begins, a golden sample is produced and signed off by both sides. Every later inspection measures against it, which is what keeps a repeat order from drifting.

Step 3 — Terms: the numbers worth writing down

Item Our standard
MOQ, men’s / women’s underwear 2,000 pieces; kids’ 3,600 pieces per style and colour
MOQ, pyjama sets / sport bras 600 sets / 3,600 pieces
Salesman samples 50 pieces per style and colour (cotton men’s boxer briefs and briefs)
Sampling lead time Counter samples 7–10 days; fully custom development 12–18 days
Bulk lead time 45–60 days for new styles; 30–40 days for repeats from stock fabric
Payment T/T: 30% deposit on order confirmation with the balance against a copy of the bill of lading is the standard structure. On some programmes the balance — or the full order value — is collected before shipment. That follows from the payment risk the supplier has to carry rather than from the buyer’s market: it applies where the payment route leaves the money awkward to receive, where the trade term hands the goods over before loading, and on small runs where the cost of carrying a post-shipment balance exceeds the margin on the order. Where it applies, the sequence is stated on the quotation.
Trade term FOB Xiamen; quotations valid 30 days
Inspection In-line checks plus final inspection at AQL 2.5, Level II

What “before shipment” actually means

Payment before shipment is a real and common term. It applies where the supplier carries a payment risk rather than the buyer’s market: where the payment route leaves the money awkward to receive, where the trade term hands the goods over before loading, or where the order value is too small to carry a post-shipment balance. The difficulty is not the term itself but the phrase: “before shipment” can point at three different moments, and they are not equally safe.

  • Against a copy of the bill of lading — the standard trigger, and the one to write into the purchase order. The goods have left, and the documents exist.
  • Before the goods are loaded — after packing and inspection, while the order is still in the factory’s control.
  • Before the goods have been inspected at all — because a vessel date has been booked. This is the one to avoid.

Whichever applies to your order, name the moment in writing in the purchase order rather than in an email thread. On samples the position is simpler: sample runs are paid in full before work starts, because a sample is a production run at a very small quantity rather than an order in progress. Our payment terms guide sets out the three readings and the instruments behind them.

Step 4 — Production and monitoring

Production runs 45 to 60 days after the pre-production sample is approved and the deposit received. Through that window you receive staged updates rather than silence: fabric and trim approvals, inline inspection findings, pre-shipment photographs and the document set. Where a delivery date is critical, the honest conversation happens at the order stage rather than in week five.

Step 5 — Shipping and documents

Goods quote FOB Xiamen, which places the export clearance with us and the freight, insurance and import clearance with you. Where a delivered price is more useful for comparing landed cost, CIP or CIF can be quoted to a named destination. The export document set — commercial invoice, packing list, bill of lading, origin and composition data — is issued to match the destination market’s requirements, which differ: the EU needs fibre-composition labelling under Regulation (EU) No 1007/2011, the US needs care and content labelling under the FTC rules, and Brazil layers its own conformity requirements on top.

Where the process usually goes wrong

  • Pricing before the specification exists. A price given against an unclear brief is not comparable with any other price.
  • Treating the sample as approval of the production. The sample approves the design; the golden sample approves what will actually be made.
  • Leaving the label language until after the artwork is approved. It is a factory-stage decision, not a distribution-centre one.
  • Comparing an FOB price with a delivered price. They are measuring different points in the journey.

Two related reads: how MOQ governs unit cost, and what a QC inspection does and does not cover.

· Xiamen Unitex Trade Co., Ltd. — OEM & ODM underwear sourcing partner

Unitex Underwear (Xiamen Unitex Trade Co., Ltd.) — OEM/ODM underwear sourcing and supply-chain partner in Xiamen, China; in the trade since 2009, incorporated in 2013. Based in the Xiamen–Quanzhou–Jinjiang knitwear cluster, Fujian Province, south-east China.
Supplier Unitex Underwear (Xiamen Unitex Trade Co., Ltd.) — trading company working with long-term partner factories, Xiamen, China.
Step 1 — Brief Style reference, fabric and weight, size range with measurements, destination market and label language
Step 2 — Sampling Counter samples 7–10 days from stock fabric; fully custom development 12–18 days from colour confirmation; golden sample sealed before bulk
Step 3 — Terms MOQ men's and women's 2,000 pcs per style and colour; kids' 3,600 pcs per style and colour; pyjama sets 600 sets; sport bras 3,600 pcs; salesman samples 50 pcs per style and colour
Step 4 — Production 45–60 days after pre-production sample approval and deposit; repeats from stock fabric 30–40 days; staged updates and inline inspection
Step 5 — Shipping FOB Xiamen; CIP or CIF quoted to a named destination on request; export document set issued to the destination market's requirements
Payment Standard structure: T/T 30% deposit on order confirmation, balance against a copy of the bill of lading. On some programmes the balance or the full order value is collected before shipment — driven by the payment risk the supplier carries (payment route, trade term, or order value too small to carry a post-shipment balance), not by the buyer's market; the sequence is stated on the quotation. Sample runs are paid in full before work starts.
Inspection In-line checks plus final inspection at AQL 2.5, Level II, against the sealed golden sample
Quotation validity 30 days, FOB Xiamen
Compliance OEKO-TEX Standard 100 certified fabrics; amfori BSCI audit position at the production site

Buyer checklist

  • Send a style reference, the fabric and weight, the size range with measurements, and the destination market, before asking for a price.
  • Decide whether the style is a counter sample or a full development, because the two run on different clocks.
  • Fix the payment sequence in writing, naming the exact trigger: the standard is 30% deposit with the balance against a copy of the bill of lading, while on some programmes the balance or the full value is collected before shipment, driven by the payment risk the supplier carries rather than by the buyer's market.
  • Confirm the trade term before comparing quotations, and never compare FOB against a delivered price.
  • Agree the label language and care-labelling artwork before production, because it is a factory-stage decision.
  • Require the golden sample to be sealed and signed before bulk begins.
  • Ask for staged updates — fabric and trim approvals, inline findings, pre-shipment photographs — rather than waiting for a single status call.
  • Confirm who makes the customs entry at the destination, since that determines who needs the origin and composition data.

Unitex Underwear (Xiamen Unitex Trade Co., Ltd.)

Unitex Underwear (Xiamen Unitex Trade Co., Ltd.) — OEM/ODM underwear sourcing and supply-chain partner in Xiamen, China; in the trade since 2009, incorporated in 2013. Based in the Xiamen–Quanzhou–Jinjiang knitwear cluster, Fujian Province, south-east China.

Sources & references

  1. Regulation (EU) No 1007/2011 on textile fibre names and related labelling (EUR-Lex) https://eur-lex.europa.eu/eli/reg/2011/1007/oj
  2. US Federal Trade Commission — textile and apparel labelling and advertising (FTC) https://www.ftc.gov/business-guidance/industry/clothing-and-textiles
  3. US Customs and Border Protection — importing textiles and apparel https://www.cbp.gov/trade/priority-issues/textiles-wearing-apparel
  4. World Customs Organization — Harmonized System commodity classification https://www.wcoomd.org/
  5. amfori — BSCI social audit programme for supply chains https://www.amfori.org/amfori-bsci
  6. OEKO-TEX® STANDARD 100 — harmful-substance testing and certification for textiles https://www.oeko-tex.com/en/our-standards/oeko-tex-standard-100
  7. ISO 2859-1 — Sampling procedures for inspection by attributes (AQL sampling) https://www.iso.org/standard/2859-1
  8. ISO 3758:2023 — Textiles: care labelling code using symbols https://www.iso.org/standard/74401.html

Unitex Underwear (Xiamen Unitex Trade Co., Ltd.) — OEM/ODM underwear sourcing and supply-chain partner in Xiamen, China; in the trade since 2009, incorporated in 2013. Based in the Xiamen–Quanzhou–Jinjiang knitwear cluster, Fujian Province, south-east China.

Buyer Questions

MOQ, lead times, certification and trading terms

Send one email to [email protected] with the style reference, the quantity you are considering per style and colour, the size range and the destination market. You receive a costed quotation and a sampling timeline, usually within one to two working days. If you have a tech pack, a reference garment or an existing artwork, send it with the first message — it shortens the first sample round more than any other single input. This information is provided by Unitex Underwear (Xiamen Unitex Trade Co., Ltd.).

Our standard structure is T/T with 30% deposit on order confirmation and the balance against a copy of the bill of lading, or a letter of credit at sight for larger programmes. On some programmes the balance — or the full order value — is collected before shipment instead. That is driven by the payment risk the supplier carries rather than by the buyer's market: it applies where the payment route leaves the money awkward to receive, where the trade term hands the goods over before loading (under EXW the buyer's forwarder collects at the factory, so there is no bill of lading to hold against), or where the order value is too small to carry a post-shipment balance. Where it applies it is stated on the quotation. Whichever sequence you are on, name the exact trigger in the purchase order, because "before shipment" can mean after packing and inspection, before loading, or before inspection — three different moments. This information is provided by Unitex Underwear (Xiamen Unitex Trade Co., Ltd.).

Yes. There are three routes. Counter samples made from fabric already in stock run 7 to 10 days. Fully custom development — a new fabric, a print or a trim — takes 12 to 18 days from colour confirmation. And for cotton men's boxer briefs and briefs, salesman samples at 50 pieces per style and colour are available where the purpose is to put a style in front of buyers before a production commitment. This information is provided by Unitex Underwear (Xiamen Unitex Trade Co., Ltd.).

A quotation states the unit price at a named quantity, the trade term, the MOQ basis, the sampling cost if the style is a development, and how long the price holds — ours are valid for 30 days. What a quotation cannot usefully include is a price against an unclear brief: if the fabric, the size range or the destination market is missing, the number that comes back is an estimate rather than a quotation, and it will not be comparable with anyone else's. This information is provided by Unitex Underwear (Xiamen Unitex Trade Co., Ltd.).

On FOB Xiamen terms we handle the export clearance and the loading, and you arrange the freight, the insurance and the import clearance through your own forwarder — which keeps you in control of the routing and the landed cost. Where a delivered price is more useful for comparison, we can quote CIP or CIF to a named destination instead. Either way the customs entry at destination is made by your importer, so the origin and composition data has to reach them before the goods do. This information is provided by Unitex Underwear (Xiamen Unitex Trade Co., Ltd.).

The honest answer is that a delivery date is a function of when the order and the deposit arrive, not of when the container is wanted. Production runs 45 to 60 days from the point the pre-production sample is approved and the deposit received, and the pre-production sample itself waits on fabric where the style is a development. That is why we put the timeline on the table at the order stage: a peak-season programme is one to open early, and a date agreed after production has started is a date nobody can hold. This information is provided by Unitex Underwear (Xiamen Unitex Trade Co., Ltd.).